双组份打胶机的操作介绍
时间:2019-04-03 来源://www.qianyantong-e.com/ 发布人:昌盛机械
双组份涂胶机是消费中空、幕墙玻璃的专用设备,可一次完成二道密封中A、B组份混合与涂胶。适用配比精度高的胶种,满足玻璃深加工企业高、高合格率流水线作业的消费需求,是大范围消费高档中空玻璃及玻璃幕墙产品的一种理想的配套设备。下面我们就说一下双组份打胶机的操作如何!
The two-component glue coating machine is a special equipment for consuming hollow and curtain wall glass. It can complete the mixing and gluing of A and B components in two seals at one time. It is suitable for mixing rubber with high precision and meets the consumption demand of high efficiency and high qualified rate pipeline operation in glass deep processing enterprises. It is an ideal matching equipment for large-scale consumption of high-grade and high-quality hollow glass and glass curtain wall products. Now let's talk about the operation of the two-component glue punch.
1、接通气源:气源接通,调理减压阀0.4~0.6Mpa,检查系统有无漏气现象。然后试运转以下动作:(1)A泵提升;(2)A泵充气;(3)B泵提升;(4)B泵充气。留意:提升气缸提升时,假如两气缸不同步,请降落原点后重新操作。
1. Turn on the gas source: turn on the gas source, adjust the pressure relief valve to 0.4~0.6 Mpa, check whether there is air leakage in the system. Then test run the following actions: (1) A pump lifting; (2) A pump inflating; (3) B pump lifting; (4) B pump inflating. Note: When lifting the cylinder, if the two cylinders are not synchronized, please drop to the origin and re-operate.
2、将A、B组份胶桶就位,并与A、B胶泵的轴线对中。以A组份为例:
2. Position the rubber drums of component A and B and align them with the axes of the rubber pumps of component A and B. Take Component A as an example:
1)操作手动转阀,将A泵提升高,提升过程中察看各管路有无拉伸过紧处。
1) Manual rotary valve is operated and pump A is lifted to the highest level. In the process of lifting, the pipelines are inspected to see if they are stretched too tightly.
2)将胶桶放置在A泵压胶盘下,开启胶桶,将其中塑料袋外翻桶外,胶面塑料片取出。
2) Place the rubber drum under the A pump pressure rubber disc, open the rubber drum, turn the plastic bag out of the drum, and take out the plastic sheet.
3)使A泵压盘迟缓降落,压盘入桶时应使其与桶口对准,将压胶盘排气口翻开,直到压盘接触胶面。待压盘内气体全部排放完并有少量胶从排气口溢出时,即可关闭排气阀。(提升开关坚持下压状态)
3) Make the pressure plate of pump A drop slowly. When the pressure plate enters the barrel, it should be aligned with the barrel mouth. Open the outlet of the pressure plate until the pressure plate contacts the rubber surface. When all the gas in the pressure plate is exhausted and a small amount of glue overflows from the exhaust port, the exhaust valve can be closed. (Lifting switch sticks to down-voltage state)
4)开机试打胶:将主泵气源开关翻开,按下胶枪开关,直A泵里空气排净枪口处出胶连续时中止。
4) Start-up test gluing: Turn the main pump air source switch on and press the glue gun switch until the air in pump A is discharged continuously.
用同样的办法操作B泵。
Operate B pump in the same way.
3、打胶操作:1)松开比例杠杆上的比例泵锁紧螺钉,将比例泵内外调整所需比例。只要当A胶和B胶的配比到达正常值时,才可停止下面的操作。
3. Gluing operation: 1) Loosen the locking screw of the proportional pump on the proportional lever and adjust the internal and external proportions of the proportional pump to the required proportions. Only when the ratio of A glue and B glue reaches the normal value, can the following operation be stopped.
2)置选择旋钮于A、B泵开,将胶枪出口对准两片玻璃的中缝,翻开胶枪开关,以恰当速度平稳地挪动胶枪使玻璃槽内的双组份胶填满充实为佳。打胶完毕时关闭胶枪。
2) Place the selection knob on pump A and B, point the rubber gun outlet at the middle seam of the two pieces of glass, turn the rubber gun switch, and move the rubber gun smoothly at the appropriate speed to fill the two-component rubber in the glass tank. Turn off the glue gun when the glue is finished.
4、改换胶桶:1)当胶桶内的胶用完时,应立刻关闭A、B开关,中止打胶。
4. Change the rubber drum: 1) When the rubber in the rubber drum is used up, the A and B switches should be closed immediately and the gluing should be stopped.
2)翻开A(或B)胶泵充气开关,选择A(或B)胶泵提升机构为上升位置,点动旋钮使压盘渐渐提起,此时应留意:胶桶尽量不要分开底盘,直压盘完整脱离胶桶时关闭A(或B)胶泵的充气开关。详细操作:将B泵关闭,翻开B胶回流开关然后翻开胶枪,胶条为白色即可。
2) Turn on the inflatable switch of A (or B) rubber pump, select the lifting mechanism of A (or B) rubber pump as the ascending position, and point the knob to gradually lift the pressure plate. At this time, we should pay attention to: the rubber bucket should not be separated from the chassis as far as possible, until the pressure plate is completely separated from the rubber bucket, close the inflatable switch of A (or B) rubber pump. Detailed operation: Close the B pump, turn on the B glue reflux switch and turn on the glue gun until the glue strip is white.
今天的精彩内容由双组份打胶机整理提供,如有更多的合作事宜欢迎光临我们的官网://www.qianyantong-e.com
Today's highlights are provided by the two-component glue machine. For more cooperation, please visit our website: //www.qianyantong-e.com.
- 介绍中空玻璃生产线的主要组成部分 2024/10/31
- 热熔胶涂布机的涂布控制系统的作用 2024/10/19
- 铝条丁基胶涂布机主要性能介绍 2024/10/16
- 中空玻璃设备生产线的实用性 2024/10/14
- 浅析中空玻璃丁基胶内溢及改善方法 2024/09/03
- 卧式丁基胶涂布机:浅析中空玻璃丁基胶内溢及改善方法 2024/09/02
- 中空玻璃打胶机的从属分类 2024/08/22
- 丁基胶涂布机升级设计的重要要素 2024/08/19
- 中空玻璃设备生产线要注意什么? 2024/08/15
- 式中空玻璃设备的自动化磨砂玻璃制造工艺 2024/08/12