中空玻璃打胶机的留意事项

时间:2018-12-20 来源://www.qianyantong-e.com/ 发布人:昌盛机械

中空玻璃打胶机的留意事项
Cautions for Hollow Glass Gluing Machine
1.在当天机器操作终了后要把胶管内的胶冲出,避免硬化;假如长工夫不适用要留意用煤油清洗胶管和胶枪。
1. After the machine operation on that day, the glue in the hose should be washed out to avoid hardening; if long time is not suitable, pay attention to cleaning the hose and gun with kerosene.
2.中空玻璃打胶机运用的硅酮胶或聚硫胶要留意杂质不能过高,低质量的胶容易梗塞胶管的过滤零碎,形成出胶不畅或不平均。
2. Silicone glue or polysulfide glue used in hollow glass gluing machine should pay attention to the impurities should not be too high, low-quality glue is easy to obstruct the filter fragments of rubber hose, resulting in poor or uneven glue production.
3.在改换胶的种类时要特别留意把中空玻璃打胶机内残留的胶冲净,丨好清洗,由于不同种类甚的胶容易反响梗塞机器。
3. When changing the type of glue, special attention should be paid to rinsing the residual glue in the hollow glass glue beater and cleaning it best, because different types or even brands of glue are easy to react to the obstruction machine.
4.液压站零碎的压力,不能调的太高,要依据室内环境温度等实践状况,调满足胶嘴正常出胶平均打胶即可。翻开液压站时一定要翻开胶枪,否则B组份管路压力将升得很高,形成平安事故。
4. Hydraulic station piecemeal pressure, can not be adjusted too high, according to the indoor environment temperature and other practical conditions, adjust to meet the normal tapping average glue can be. When turning over the hydraulic station, the rubber gun must be turned over. Otherwise, the pressure of component B pipeline will rise very high, resulting in a safety accident.

双组份打胶机
5.A胶提胶泵延续任务1分钟以上没有供胶中止,阐明管路内有空气,此时会报警,须翻开泵上管接头再翻开A胶提胶泵,直到出胶爲止,中止并接好接头,胶枪会呈现有空气的哔哔爆丨破声,空气排净就好了。
5.A rubber lift pump lasts more than one minute without ceasing to supply rubber. It is stated that there is air in the pipeline. At this time, the alarm will be given. It is necessary to turn on the upper pipe joint of the pump and turn on the A rubber lift pump until the rubber is released. The joint will be stopped and connected. The rubber gun will appear the beeping sound of air, and the air will be exhausted.
6.硅酮胶B 组份遇空气会结壳,影响泵的正常任务和管路的疏通,因而,停机时B组份胶的一切通道在泄压后均应封闭,使B组份不得接触空气。
6. Silicone gel B component will crust when it meets the air, which will affect the normal task of the pump and the dredging of the pipeline. Therefore, all passages of silicone gel B component should be closed after pressure relief, so that component B can not touch the air.
7.正常任务时不要断气源,假如发现断气源应中止任务。
7. Do not stop the gas source during normal tasks. If the gas source is found, the task should be terminated.
综上所述有济南昌盛机械提供,想了解更多双组份打胶机知识,欢迎关注我们的网站:http://linshi.jncsjx.com谢谢支持!
In summary, all the above-mentioned Jinan Changsheng Machinery provides, want to know more about the two-component glue machine knowledge, welcome to pay attention to our website: http://linshi.jncsjx.com Thank you for your support!

联系我们Contact us

  • 咨询热线:0531-85717458 13705446998
  • 公司地址: 山东省德州市齐河安头乡企巢工业园
  • 扫码联系我们:

截屏,微信识别二维码

微信号:13705446998

//
Baidu
map